|
Jared is a Cedar City native. He is a Cedar High School graduate. He married Lisa C. Hunziker in 1994 and they have four children. Jared attended Southern Utah University and received his BS degree in Physical Science – Geology in 1998.
Since graduation Jared has gained experience with geotechnical, geological, and materials testing (both in the field and in the laboratory). He worked for Applied Geotechnical Engineering Consultants as a Field Technician in St. George, Utah, then as a Laboratory Supervisor for Jones and DeMille Engineering in Richfield, Utah, then Jared worked for four years as Staff Geologist for GEO Consultants in Cedar City, Utah.
Jared received his Professional Geologist License for the state of Utah and has received many certifications for both field and laboratory testing from the Western Alliance for Quality Transportation Construction (WAQTC) and the American Concrete Institute (ACI). His licenses and certifications include:
PG -Professional Geologist License NTS -Nuclear Density Gauge Testing WAQTC -ACI ACI-CFT Concrete Testing WAQTC -AgTT – Aggregate Testing Technician WAQTC -AsTT – Asphalt Testing Technician WAQTC -EbTT/DTT – Embankment Testing Technician WAQTC -LbTT – Laboratory Testing Technician WAQTC -STT – Strength Testing Technician (Concrete) ACI -ACI – Concrete Field Testing Technician ACI -ACI – Concrete Laboratory Testing Technician DEQ-DWQ -Utah Water System Operator/ Water Dist. Specialist
Jared has been involved in a fault study of the Washington Fault in Washington County where he logged, mapped, and recorded his findings, including the displacement of the fault. He has also completed a preliminary landslide study on Cedar Mountain.
Jared has experience with southern Utah conditions, where he has completed several Phase I Environmental Site Assessments. He has done geotechnical field and laboratory tests. He has logged trenches and boring holes on drilling rigs, environmental borings, water samples, construction testing and observations and numerous other field and laboratory tests.
Some of the major projects Jared has been involved with include:
Gunnison Reservoir RCC (Roller Compacted Concrete) Dam Home Depot, Cedar City Cedar Breaks National Monument Roadway Improvement Phase I, and Phase II. Cedar City Projects for geotechnical, geological, and construction investigations. |
|
President/Professional Engineer |
|
E-mail: jared@gemengineeringinc.com |
|
Phone: 435-867-6478 |



